Green Audit
RJ College
Location: Ghatkopar, Mumbai
Year: 2018-19, 2021-22
Green Audit and Green Campus Feasibility Report for RJ College for NAAC Accreditation
- Recommendations for Phase I energy savings of 28,000 units through energy efficient measures with a payback of 3 years
- The College has 34 nos. of Solar PV panels installed on the Rooftop
- The electricity bills can be reduced by 15-20% by collaborating with Utility (Adani) to introduce net metering system
- Rainwater from the rooftop catchment is collected and channelled through the downtake pipes fitted with filters and used to recharge the ring well. This water is used for landscaping and watering the plants
- Potential of water reduction by 50% through water efficient equipment
- Indoor air quality (IAQ) and environment improvement plan.
- Recommendations for Solar PV, Solar Hot water, green building and ISO certification as means of continual improvement towards Green Campus & sustainability